1.After the intention to purchase an EV, check the installation conditions
Before the installation of EV charging piles, the first thing you need to do is to survey whether you have matched the installation conditions, such as whether there is a fixed parking spaces, how far from the power grid lines, etc.. The simplest method is to ask residential property for the situation. Property mustknow some simple relevant installation issues, such as the installation of the program, the use of electricity, installation area and so on. In fact, you don’t have to worry about that, because themanufacturers will send personnel to solve the professional problems later.

2.Go to 4S shop to apply for the survey of installation field, select the type of charging piles
When the staff survey the site, it is best to ask the property together to deal with the installation issues, thus can not only have the professionals to answer questions about the property, but also improve the installation efficiency. And the property will also give some suggestions to the installation staff, such as parking spaces are in line with the installation conditions, whether meet the requirements of the line and so on.
As for charging pile types, at present home charging pile can be divided into vertical type and wall mount type electric vehicle charger. The advantage of wall mount type is saving space, low price, but must be installed in the wall which can be wired. The price of vertical type is higher, and it will occupy a larger space, but can be installed in the open parking lot.

SOROTEC wall mount type electric vehicle charger.

EV AC Charging Post---- Wall Mount Type (electric vehicle charger,electrical car charger,EV car chargers)

3.Find out what type of residential power supply is
After the investigation and consultation of the construction site, the problem you need to solve is the power supply. In fact, the most common power supply of charging pile is ordinary residents electricity, we need to apply box power supply wire from the state power grid, after the approval of qualified, the state power grid will send corresponding staff to wire. In addition, there are both advantages and disadvantages if use small commercial electric pressure. Its shortage is more electricity cost, the advantage is to avoid the cumbersome process of dealing with the state power grid, you can directly ask property to solve the problems.

4.Confirm the installation scheme of charging pile, start construction
A few days after the survey and installation site, the construction side will give the corresponding installation program, generally is the installation costs and details, as well as the construction effect chart. After property confirm the price and the material is correct, you can let the workers to install charging pile. If the wiring has been completed at this time, then you can connect to the charging pile and use normally. Due to the charging pile can be considered as the necessary supporting equipment for the electric vehicle, so now many electric vehicle manufacturers with different charging pile installation policy, some manufacturers responsible for free installation, the other may require customers pay a few cost.

5.If charging pile is not completed, can use a portable charger in emergency
Because it involves multi-party negotiation, so the speed of construction will be a little slower, the cycle is generally 1 months. So within a period of no private charging pile, in addition to charge in the public charging stations and 4S shop, the by portable ev charger is also possible under the premise of ensuring the safety, but do not recommend use for a long time.